|
1
|
|
|
2
|
|
|
3
|
- Aqua-Air Industries, Inc. welcomes you.
In order to meet the demands of the diving industry and to
maintain the accelerated pace towards greater operational depth, we have
utilized the knowledge and past experience of all our personnel to design
and construct the Saturation Diving System that is safe, efficient and
economical.
|
|
4
|
- Veolia ES (ONYX)
- Superior Offshore
- Oceaneering Int’l.
- Con-Dive, LLC
- S & J Diving
- Oceanografia
- Inspectronics
- Global Diving & Salvage
- Chet Morrison Contractors
|
|
5
|
|
|
6
|
|
|
7
|
|
|
8
|
|
|
9
|
|
|
10
|
|
|
11
|
|
|
12
|
|
|
13
|
|
|
14
|
|
|
15
|
|
|
16
|
|
|
17
|
|
|
18
|
- Electric Hot Water Unit for Sat (Half). Heater unit is electrically
powered and capable of heating seawater and freshwater with a flow of
6.5 GPM with 58 PSI (4 Bars) inlet water pressure. It has a single boiler heat exchanger
pressure vessel with over pressurization devices. CAT pump is
incorporated to boost the hot water supply to the diver at 450 PSI (31
Bars).
|
|
19
|
- Unit Service Pressure - 3600 PSI
- Total Water Volume –133.5 cu. ft.
- Length - 34 ft.
- Diameter –18 in.
- Manifold - Each cylinder’s valve tied to central manifold with
additional valve at each end
- Helium – 29,391 cu.ft.@ 3600 PSI
- Nitrogen – 30,060 cu.ft. @ 3600PSI
- Air – 30,915 cu.ft. @ 3600 cu.ft. PSI
|
|
20
|
- Unit Service Pressure - 3185 PSI
- Total Water Volume -267 cu. ft.
- Length - 34 ft.
- Diameter –18 in.
- Manifold - Each cylinder’s valve tied to central manifold with
additional valve at each end
- Helium – 49,872 cu.ft.@ 3000 PSI
- Nitrogen – 51,774 cu.ft. @ 3000PSI
- Air – 53,124cu.ft. @ 3000 cu.ft. PSI
|
|
21
|
|
|
22
|
|
|
23
|
|
|
24
|
|
|
25
|
- The handling system for the bell incorporates an “U" Frame bell winch, power sheave, and
guideline winch. The winches, the spool piece with hydraulic clamp and
umbilical rollers are controlled from the bell control room. The system
is designed with safety factors based on its rated capacity at rated
speed. Structural design criteria involve dead, live, dynamic and other
loads.
|
|
26
|
- Additional the structural members are treated as stress components of
the entire handling system. The power system and support equipment is
designed for 100% of the designed load
|
|
27
|
|
|
28
|
|
|
29
|
|
|
30
|
|
|
31
|
|
|
32
|
|
|
33
|
- Unit Service Pressure - 3600 PSI
- Total Water Volume-356 cu. ft.
- Length - 34 ft.
- Diameter –18 in.
- Manifold - Each cylinder’s valve tied to central manifold with
additional valve at each end
- Helium – 78,376 cu.ft.@ 3600 PSI
- Nitrogen – 80,160 cu.ft. @ 3600PSI
- Air – 70,832 @ 3600 cu.ft. PSI
|
|
34
|
|
|
35
|
|
|
36
|
|
|
37
|
|
|
38
|
|
|
39
|
- Unit Service Pressure - 3600 PSI
- Total Water Volume – 60 cu. ft.
- Length - 12 ft.
- Diameter –30 in.
- Manifold - Cylinder’s valve tied to central manifold with additional
valve at each end
- Helium – 13,209 cu.ft.@ 3600 PSI
- Nitrogen – 13,510 cu.ft. @ 3600PSI
- Air – 13,894 cu.ft. @ 3600 cu.ft. PSI
|
|
40
|
- Hyperbaric Rescue Chamber (HRC) Control “Flyway” Module
|
|
41
|
|
|
42
|
- The control room will have the following services included in the
system:
- 01) Depth monitoring system.
- 02) Pressurization and vent.
- 03) Bib control panel
- 04) CO2 and O2 analyzer panel
- 05) Calibration gas panel
- 06) O2 injection panel
- 07) Temperature and humidity monitoring panel.
|
|
43
|
- 08) Communication control panel.
- 09) On-line gas storage panel (distribution).
- · Pressurization.
- · Bibs.
- · Treatment mix.
- 10) Over pressurization relief system.
- 11) TV monitoring system.
- 12) Public Address system.
- 13) Two man self contained B/A set with hose line
connections.
|
|
44
|
- 14) Gas distribution marker boards.
- 15) LP compressor and gas compressor monitoring panel.
- 16) Electric distribution panel
|
|
45
|
- Potable Water System
- The potable water system will supply hot and cold water at 103 psi (7
bar) over the working pressure in continuous operation and consist of
two systems including:
- 01)Two SS Steel receivers 600 psi working pressure.
- 02)Two piston pumps with 500 psi working pressure each.
- 03)Two pressure switches.
- 04)Two pulse restrictors.
- 05)Mounting rack.
- 06)15 gallon hot water unit
|
|
46
|
- Treatment Rack
- This rack will hold the treatment mix gas which includes (1) rack of 12
cylinders of 440 cu. ft. to 2400 psi each. The rack will have isolation
valves and manifold and will be piped to the control room via HP
manifold.
|
|
47
|
- Environmental Conditioning Unit
- Chiller package Model OC-500R-H/C-ECU.
- A completely packaged closed loop type cooler with the capacity to
remove 60,000 BTU/Hr while re-circulating 50% water/glycol at -36°F in
an 81° F (-10°c in a 35°c)
ambient. Cooler to consist of dual 7.5Hp air cooled conducing unit with
full controls for automatic operation including:
- 2) Digital temperature control units.
|
|
48
|
- 2) Direct expansion type evaporator.
- 2) 316SS sump tank with filler/breather cap and level gauge for hot and
cold systems
- 2) Pumps with capacity of 10 gpm at 5 psi electric panel 480/440 Volt
- 3 phase, 60 Hz.
- 2) 3 kw heating capacity
- 17)Solenoid control valves
operated by humidity/temperature
control in control room
|
|
49
|
- Sewage Tank
- Volume tank rate at 450 PSI used as sanitary holding tank. Tank
outfitted with valve controls and gauges for the discharging of sewage
material.
- HRC Umbilical
- Length to be provided is 50 ft according to AAI specifications. Complete
list of the services in the bundle will give full control of the HRC
|
|
50
|
- Decades of experience combined
with R&D and testing, have time and time again provided products and
services invaluable to our customers worldwide. Other companies may
imitate but cannot duplicate the quality and innovation Aqua-Air has
contributed to the diving industry.
|
|
51
|
- Much of our credit goes to our valued customers for recognizing Aqua-Air
Industries, Inc. as your commercial and offshore supply specialist.
- Aqua-Air Industries, Inc. sincerely thanks the commercial diver, diving
companies, military, government agencies, and the scientific community
for giving us the opportunity of supplying your equipment needs.
|
|
52
|
- The staff of Aqua-Air
Industries, Inc promises to continue to dedicate ourselves to supplying
top quality diving equipment to better serve our customers WORLDWIDE
|
|
53
|
|